By Smart Builder 360 Team  |  Principal Contributors: Kurt Shank & Dave Daugherty  |  Updated: November 19, 2026

The Ohio building code for houses is the Residential Code of Ohio (RCO). The edition in force in November 2026 is still the 2019 RCO. It's based on the 2018 International Residential Code and took effect July 1, 2019, with 2024 updates to frost protection and the electrical chapter. Local building departments certified by the state enforce it through plan approval (the permit), inspections and a certificate of occupancy.

Which Edition Is in Effect: the 2019 Residential Code of Ohio

As of November 2026, Ohio homes are built to the 2019 Residential Code of Ohio. It uses the 2018 International Residential Code as its base, with Ohio changes, and took effect July 1, 2019. The Ohio Board of Building Standards updated three of its rules in 2024. No newer edition based on a later IRC has been adopted.

Ohio has two state building codes. The Ohio Building Code (OBC) covers commercial and larger residential buildings; its 2024 edition took effect March 1, 2024. The RCO covers 1-, 2- and 3-family homes, so it's the Ohio building code that applies to a house. It sits in the Ohio Administrative Code as chapters 4101:8-1 to 4101:8-25, 4101:8-29, 4101:8-34 and 4101:8-44.

DateWhat changed
July 1, 2019The 2019 RCO takes effect, based on the 2018 International Residential Code with Ohio amendments.
March 1, 2024Chapter 4 (foundations) gets frost protection exceptions.
April 15, 2024Chapter 34 (electrical) moves to the 2023 National Electrical Code with Ohio amendments; Chapter 44 reference standards updated.
July to September 2026Five-year-review drafts circulate. Comments closed September 30, 2026. Public hearing "coming soon." Nothing adopted.

What the 2026 draft would change. It amends the 2019 RCO rather than moving to a newer IRC. The Board's impact analysis lists an optional 2018 IRC plumbing path, tiny house and patio cover rules, and guards on patios over 30 inches high. None of it is law until adopted with an effective date, so build to the 2019 RCO.

What the Residential Code of Ohio Covers

The RCO applies to building, altering, enlarging, repairing, moving and demolishing 1-, 2- and 3-family dwellings, plus their accessory structures like detached garages and sheds. Model homes count too. Some buildings fall outside it: manufactured homes built to the federal HUD code, farm buildings, and 2- or 3-family buildings with a shared exit, which follow the Ohio Building Code.

The RCO is also uniform. Under Ohio Revised Code 3781.10, where a certified department enforces it, a local code can't differ from the RCO for new homes, repairs or alterations, with narrow exceptions such as a rule on something the RCO doesn't address. Zoning, setbacks and sewer rules still vary by town; the construction code doesn't.

Who Enforces It: Certified Residential Building Departments

Local building departments enforce the RCO, but only after the Ohio Board of Building Standards certifies them for residential work. A city, township or county department can be certified. Where no certified residential department has jurisdiction, the RCO says the owner doesn't have to submit plans, get approvals, call inspections or get a certificate of occupancy.

Some rural areas have no residential department, so there's no state-required residential permit there. Zoning, the county health department and your lender may still want their own sign-offs, as our certificate of occupancy guide explains. A department's certification can also be limited, for example leaving out plumbing; then another office inspects that trade.

Builders have seats at the table. By law, two of the Board's 15 members are residential general contractors picked from ten names the Ohio Home Builders Association sends the Governor. A nine-member Residential Construction Advisory Committee, including three residential general contractors and a remodeler, recommends RCO changes. See our OHBA guide.

Ohio Building Permits: How Plan Approval Works

In RCO terms, a building permit is a plan approval. Before you build, add on, alter or move a home, or install regulated equipment, the owner or the owner's agent applies to the certified department with two or more sets of construction documents. The department has 30 days to approve them, or it counts as a denial you can appeal.

  1. Apply on the department's form, signed by the owner or an authorized agent. On a remodel, the contractor often applies as the owner's agent; ask whether your department wants contractors registered with it first.
  2. Attach the documents. A full set has a site plan from a boundary survey with setbacks, floor plans, wall sections and flashing details, the structure, and the mechanical, plumbing, electrical and energy details. For an alteration, the official can waive the site plan.
  3. Plan review. If there are problems, you revise and resubmit, and only the corrected items get reviewed again. For minor fixes you can ask for a conditional approval, and you can get a phased approval to start the foundation before the full set is done, at your own risk.
  4. Post the certificate of plan approval on site until the final inspections are done, with an approved plan set for the inspectors.
  5. Submit changes first. Substantive changes need approval before you build them. A client's layout change is a written change order for you and a plan revision for the department.

Watch the clock. A plan approval is void if work hasn't started within 12 months; the owner can get one 12-month extension by asking at least 10 days ahead, for a fee of no more than $100. If work stops for more than six months, the approval is void unless you get one of two six-month extensions on the same terms.

Required Inspections and the Order They Come In

When the department issues plan approval, it must give you a list of required inspections for that job. You call each one when the work is ready and keep it exposed until it's checked. If the inspector doesn't come within four days, not counting weekends and legal holidays, the RCO lets you keep working up to the next required inspection.

One item comes before the first inspection. Before work starts on a new home or an addition, the RCO requires the boundary lines marked at their corners, with permanent markers or with offset markers of record with the owner. It's a requirement rather than a visit; some departments check it, others just expect it.

InspectionWhen it happens
Footing and foundationExcavation done, rebar and forms in place. Ready-mix concrete doesn't have to be on site.
Slab and under-floorRebar, in-slab piping, conduit, insulation and vapor retarder in, before the pour or subfloor.
Rough electrical, plumbing and HVACMust be approved before the frame inspection.
FrameRoof sheathing, framing, fireblocking and bracing in place, concealed pipes, chimneys and vents complete, and the rough trades already approved.
Gypsum boardOnly where drywall is part of a fire-rated or shear assembly, before taping.
EnergyInsulation, window U-values, duct insulation, air sealing and equipment efficiency.
Equipment and finalSystems checked against the plans and listings, then the certificate of occupancy.

A real list is often shorter. Stark County says every new structure gets a footer and foundation inspection, a rough inspection and a final.

The owner's side provides access and pays for required tests. Passed and failed inspections both go on the on-site inspection record. If an item fails, the inspector offers three options: fix it, revise the plans and resubmit them, or leave it and have it referred to the building official for a decision. The owner's side picks one, and the record notes the failed items, the option chosen and the estimated dates for the fix and the re-inspection.

That record stays on the job, so have the super photograph it after every inspection. For the office, the photo is the proof of each passed stage, and a failed entry with a re-inspection date is the early warning that a draw will slip.

Inspector calls for an extra GFCI or a bigger header? Put it on a written change order the client signs before you do the work. On a financed job, Smart Builder 360 also makes its own draw form from the milestone, amount and percent complete you enter, and keeps the documents with that draw. Try it free for 30 days, no credit card.

Certificate of Occupancy or Certificate of Completion

No new home or addition can be used until the residential building official issues a certificate of occupancy. Alterations and repairs can get a certificate of completion instead. The official has to issue the CO in a timely manner once the work matches the approved plans, final tests and inspections are done and no orders are outstanding.

Every official with jurisdiction signs it, so if another office did plumbing, both sign. Permanent power, gas or fuel connections wait for the official's approval, though a temporary connection can be approved.

The CO also drives the money. Lenders often release the final holdback only after the CO, final lien releases and a title check, as our guide to construction loans in Ohio shows. On a remodel, the certificate of completion often plays the same role, and on an addition it's the CO: the last payment often waits on that paper. The client's punch list is separate: the CO says the house meets code, not that every scuff is fixed.

Electrical, Plumbing and HVAC: Who Inspects Them

The RCO's electrical chapter adopts the National Electrical Code, updated to the 2023 edition on April 15, 2024. Plumbing follows the Ohio Plumbing Code with a few RCO changes. Certified electrical safety inspectors, residential plumbing inspectors and building or mechanical inspectors check the work, often under separate trade permits from the building permit.

  • Electrical. Ohio's NEC amendments include practical exceptions: a single sump pump receptacle needs no GFCI if a GFCI duplex is within six feet, and neither does a single ceiling receptacle for a garage door opener.
  • Plumbing. Depending on the area, the health department, a board of health or the building department enforces it.
  • HVAC. A residential mechanical inspector checks it, or the building inspector if the department has none.

Cleveland's FAQ says electrical, plumbing and HVAC contractors need a State of Ohio license before registering with the city. Our Ohio contractor license guide covers the five state-licensed trades.

Energy Rules: Insulation, Air Sealing and the Blower Door Test

Chapter 11 of the RCO sets the energy rules. You can comply through its prescriptive tables, a simulated performance model, an Energy Rating Index score, the full International Energy Conservation Code, or the OHBA Alternative Energy Code Option. Both the prescriptive path and the OHBA path require a blower door test, with a limit of five air changes per hour.

  • On the plans: insulation R-values, window U-factors and solar heat gain, equipment efficiencies, and duct and air sealing details.
  • Prescriptive test: no more than five air changes per hour at 50 pascals, after all envelope penetrations are made, with a signed report to the building official.
  • Duct test (section 1103.3.3, marked mandatory): unless the ducts and air handlers are entirely inside conditioned space, the ducts get a pressure test at rough-in or after construction. The prescriptive limit is 4 cubic feet per minute per 100 square feet of conditioned floor area (3 at a rough-in test without the air handler installed), and a signed report goes to the building official.
  • OHBA option (section 1112): pick one of its two paths and name it on the plans. Tested leakage must be under 5 air changes per hour at 50 pascals, after rough-in. When a builder finishes seven or more similar homes within 120 days, the code official can test a sample instead, at least 1 in 7 or 15%, until one fails.
  • Additions (section 1108): under the prescriptive addition rules, the addition doesn't need a building envelope (blower door) test, and ducts extended from an existing system with less than 40 feet in unconditioned space don't need the duct test.

Remodels and Additions: When You Need a Permit

Additions and alterations must meet the code for new construction and need approval, but parts of the house you don't touch don't have to be brought up to current code. The RCO lists work that needs no approval, such as painting, flooring, cabinets, countertops, small sheds, low fences and minor repairs that leave structure, exits and building systems alone.

Section 102.10 exempts, among other items:

  • Detached one-story sheds and playhouses up to 200 square feet
  • Fences up to 6 feet, and retaining walls up to 4 feet that hold back no extra load
  • Painting, papering, tiling, carpeting, cabinets, countertops and similar finish work
  • Decks up to 200 square feet that are no more than 30 inches above grade at any point, aren't attached to the house and don't serve the required exit door. Any attached deck needs approval.
  • Replacing a branch circuit breaker or fuse with one of the required capacity and type, in the same location
  • Clearing stoppages, repairing leaks in pipes, valves or fixtures, and pulling and resetting a toilet, as long as the repair doesn't replace more than one fixture or rearrange valves, pipes or fixtures. Replacing a defective concealed pipe with new material counts as new work and needs approval.

Exempt work still has to meet the code, and minor repairs can't cut into walls or structure, change exits, or add, alter, replace or move piping or wiring. A kitchen example: new cabinets and counters need no approval. Move the sink or add a circuit and you need plumbing and electrical approval. Remove a bearing wall and you need plans.

Departments read the edges differently, so ask before you bid. Cleveland requires a permit to reroof, side, or replace doors and windows. Cincinnati's guide says same-size windows and roof coverings of no more than two layers don't need one. Stark County lists roof replacement as needing one.

Here's how those rules land on common remodel jobs. Where it varies by city, check your department.

JobApproval needed?
Cabinets, countertops, painting, tile, carpetNo. Finish work is exempt.
Kitchen with a moved sink or a new circuitYes: plumbing and electrical.
Bath: fix a leak or reset a toiletNo, if no more than one fixture is replaced and nothing is rearranged.
Bath with fixtures movedYes: plumbing, plus electrical for new wiring.
Basement finishUsually yes, since new walls, wiring and plumbing aren't on the exempt list; check your department. A new bedroom needs an emergency escape opening.
Attached deckYes, at any size. Columbus also wants zoning approval for any deck over 169 square feet.
AdditionYes: plans, inspections and a certificate of occupancy.
Same-size windows, reroofVaries by city: check your department.

A permitted remodel can also bring alarms up to code. When permitted work alters a bedroom or the area just outside it, or adds a bedroom, smoke alarms go in those areas as for a new home; exterior work like roofing, siding, windows, doors, porches and decks, and plumbing or mechanical work, are exempt. In a home with fuel-fired appliances or an attached garage, permitted work on a bedroom, the area outside it, an attached garage or a fuel-fired appliance means carbon monoxide alarms where a new home would have them. A new bedroom, including one created in a basement, needs an emergency escape and rescue opening. Price these into the bid.

When You Disagree: Orders and Appeals

A denial or correction order from the building official must be a written adjudication order that cites the code section and says what has to change. You have 30 days from mailing to appeal. A certified local board of building appeals hears it, or the state Board of Building Appeals if there's no local board. Courts come after that.

  • Stop work orders. Work named in the order stops until the appeal ends or the order is released. An owner who neither complies nor appeals can be prosecuted and fined up to $500.
  • After the hearing. The board decides within 30 days. A party can then ask the state board for a new hearing or go to the county court of common pleas. A board can grant a variance where strict enforcement causes unnecessary hardship.
  • Complaints about staff go in writing to the Ohio Board of Building Standards.

Columbus, Cincinnati, Cleveland and Stark County

The construction code is the same statewide, but each department runs its own counter, portal and forms. First check whether the lot is inside city limits, since suburbs and townships often have their own department or use the county's. Here's what four large departments say on their own websites.

Columbus building permit

The Department of Building and Zoning Services, 111 North Front Street, takes applications through the city's Citizen Access Portal, where you can also check a permit's status; register for an online account first. Its code page lists the 2019 RCO and the 2023 National Electrical Code for one-, two- and three-family buildings. Its deck memo (CIC #23, revised April 2026) adds that any deck over 169 square feet needs zoning approval, whatever its height or location.

Cincinnati building permit

The Department of Buildings & Inspections runs a Permit Center at 805 Central Avenue, Suite 500 (513-352-3271). Its permit guide says plumbing, electrical and HVAC work need separate permits, a homeowner may draw the plans for a 1-, 2- or 3-family detached home, and working without a required permit adds an investigation fee equal to the permit fee.

Cleveland building permit

The Department of Building & Housing uses an online Permit Portal. You first file a Project application, reviewed by Zoning, Planning, Landmarks and others, then apply for the building permit. Drawings for 1-, 2- and 3-family homes don't have to be sealed. Homeowners pulling their own permit sign a homeowner's affidavit.

Stark County building department

The Stark County Building Inspection Department covers the unincorporated county and contract villages: Brewster, East Canton, Hills and Dales, Limaville, Magnolia, Meyers Lake, Minerva and Waynesburg. Alliance, Canton, Massillon and North Canton have their own departments. For a new house on sewer, the county's order is house number, sewer permit, zoning permit, then building permit. Starting without a permit brings a 200% penalty on the fees.

Code Inspections vs Lender Draw Inspections

A code inspection and a draw inspection answer different questions. The building department checks that the work meets the RCO and the approved plans. The lender's inspector checks how much work is in place before releasing money. Passing one doesn't satisfy the other, and they rarely happen on the same day.

Set your draw stages around the code inspections you already have to pass, like foundation, frame and final, so each draw request goes in with a passed inspection behind it. See the bank draw process for home builders. Ohio lien law adds its own start-of-job paperwork, the notice of commencement.

Here's a common pattern; your lender's schedule decides.

Draw stageCode inspection passed first
FoundationFooting and foundation
Rough-inRough electrical, plumbing and HVAC, then frame
InsulationEnergy (insulation and air sealing)
FinalFinal inspections and the certificate of occupancy

Keeping Permit and Inspection Paperwork With the Job

Most code paperwork ends up in the office, even though the inspection record lives on the job. Keep one file per job, so the super, the office and the lender all work from the same papers. Here's what each job file should hold, roughly in the order you get it:

  • The certificate of plan approval
  • The approved plans
  • The required inspection list
  • Any separate trade permits
  • A photo of the inspection record after every inspection, failed entries included
  • Approved plan revisions
  • The blower door and duct test reports
  • The certificate of occupancy or certificate of completion

Smart Builder 360 doesn't pull permits or schedule inspections. Its features page lists a Files area with Final Items, Drawings, Job Photos, Quotes and Meeting Minutes, a natural home for the approved plans, the plan approval and the photos of the inspection record.

When a passed inspection triggers a draw, you enter the milestone, amount and percent complete, and the app makes its own bank draw form, with documents and lien waiver notes kept with that draw; signed waivers go in Files. Code-driven changes go on written change orders, client selections are recorded, and the project statement shows what's been drawn and paid. The photo of the inspection record sits in the same job as the draw, so when the bank asks whether the frame passed, it's there.

Try Smart Builder 360 free for 30 days.

For Ohio remodels, additions and new homes: written change orders, client selections, project statements and each job's Files in one place, plus estimates, proposals, scheduling and bank draw forms. No credit card required. See pricing.

Start my free trial

Frequently Asked Questions

What building code does Ohio use for houses?

The Residential Code of Ohio (RCO), for 1-, 2- and 3-family homes. The current edition is the 2019 RCO, based on the 2018 International Residential Code and in effect since July 1, 2019.

Is the 2019 Residential Code of Ohio still in effect in 2026?

Yes, with 2024 amendments, including the 2023 National Electrical Code. A five-year-review draft circulated in 2026, with comments closing September 30, 2026, but it hasn't been adopted and has no effective date.

Who issues building permits in Ohio?

A city, township or county building department certified by the Ohio Board of Building Standards for residential work. The RCO calls the permit a plan approval. Where no certified residential department has jurisdiction, the RCO doesn't require plan approval, inspections or a certificate of occupancy, though zoning and health rules still apply.

Do I need a permit to remodel in Ohio?

Usually, if the work touches structure, exits, or plumbing, electrical or HVAC systems. The RCO exempts finish work like painting, cabinets and countertops, small sheds, fences up to 6 feet and minor repairs. Ask your department before you bid.

How long is an Ohio building permit good for?

A plan approval is void if work doesn't start within 12 months, with one 12-month extension available. If work stops for over six months, it's void unless you get one of two six-month extensions. Each extension fee is capped at $100.

What happens if the building inspector doesn't show up?

If the inspector doesn't inspect within four days of the work being ready, not counting Saturdays, Sundays and legal holidays, the RCO lets you proceed. You can only go as far as the next required inspection.

Sources